10 | nVent.com/ERICO
Figure : Precautions required for Inspection Well excavation and lower termination corrosion protection
It is advised that an Inspection Well is
installed where the end of the downconductor
terminates to the grounding system.
This provides a convenient access point for
disconnection and future testing.
Figure : Radial ground
Lightning Event
Counter - LEC V
Conductive Saddles
Downconductor
Inspection Well
Lower Termination
(Enclose in
Weatherproofing Mastic)
Copper Ground Tape
Typical lengths, minimum of m ( ft). (Lengths are dependant
upon soil resistivity reading) @ mm ( in.) depth or greater
if required, to ensure that it is below the frost line.
Ground rods
clamped or
welded to
copper ground
tape using
Cadweld
POWER
GAS
WATER
IRRIGATION
COMMUNICATIONS
SEWERAGE/STORMWATER
Waterproofing mastic tape should
be used for waterproofing corrosion
vulnerable connections.
Protect Against Corrosion
The copper tape or or
/ copper conductors
are encased in Ground
Enhancement Material
(GEMA)