EasyManua.ls Logo

Olimpia splendid Unico Twin - Indoor Unit Installation Steps; Fastening Plate Mounting; Pipe Passage Hole Creation

Olimpia splendid Unico Twin
248 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNICO TWIN
L R
ø ø
H
H
B
101,6 115,6 47 65
L
mm
R
mm
H
mm
ø
mm
ENGLISH
EN - 17
2.4.1 - INSTALLATION OF THE INSIDE UNIT
INSTALLATION OF FASTENING PLATE
Aftercheckingwhatisdescribedinparagraph“2.2”,proceedwiththemountingofthexingplate(L1),con-
sideringthedimensionsindicatedingure“B”.
a. Position the plate against the wall.
b. Mark the drilling points, making sure that they are level.
c. Make the holes necessary in the wall using a suitable bit.
Make sure there are no pipes or electric ducts in the drilling area.
d.Inserttheplugs(H)intotheholesandxtheplate(L1)tothewallusingthescrews(H)supplied(gure
23).
Using a spirit level, make sure that the xing plate (L1) is level.
e. If the wall is in wood, use relevant countersunk-head screws (not supplied).
f. Check the stability of the plate (L1), moving it laterally and vertically.
REALISATION OF PIPE PASSAGE HOLES
If the connection lines arrive from the rear right of the indoor unit, a hole “R” must be made for passage of
the piping,
assuccessivelydescribed(seegureB).
a. Make a 8÷10 mm hole in the centre of the position “R”,withslopetowardstheoutdoorsof5%(toallow
condensatetobedrainedcorrectly(gure9).
b. Make the hole “R”usingacoredrillwiththediameterindicatedinthetableofgure“B”.
c. Insert the drain line piping and that of refrigeration into the hole along with the electric connection cable.
If the connection lines arrive from the rear left of the indoor unit, a hole “L” must be made for passage of the
piping(seegureB).
xingbracket
indoor unit

Table of Contents

Other manuals for Olimpia splendid Unico Twin

Related product manuals