EasyManua.ls Logo

OLT Bayside - Page 21

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53. Place and position 2nd Floor Panel
on Floor Joists. Position as per Step 52.
2nd Panelized Floor Panel
54. Place and position remaining Floor
Panels around the Floor Joists. Position
as per Step 52.
8th Floor Panel.
55. With all panels evenly spaced and
and in their correct position, secure
each panel down to floor joists with
8 - 2” screws per panel.
Note, drill 1/8” pilots hole to prevent
splitting.
56. Place the 2nd to Last Deck Board
on Floor Joists and position between
joists.
2nd to Last Deck Board
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 21

Related product manuals