EasyManua.ls Logo

OM XE 15 - Page 50

Default Icon
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.72.7
This label is removed by the technician after putting the truck intoThis label is removed by the technician after putting the truck into
operation.operation.
It warns the user not to operate the truck until it has been put intoIt warns the user not to operate the truck until it has been put into
operation by a technician from the manufacturer.operation by a technician from the manufacturer.
Plate with red background, black Plate with red background, black wording.wording.
This label is removed by the technician after putting the truck intoThis label is removed by the technician after putting the truck into
operation, and contains the following information:operation, and contains the following information:
The wheel nuts must be tightened in accordance with the followingThe wheel nuts must be tightened in accordance with the following
schedule:schedule:
Before the truck is put into operationBefore the truck is put into operation
Every 10 operating hours until the first tune-upEvery 10 operating hours until the first tune-up
Every 100 operating hours after the tune-upEvery 100 operating hours after the tune-up
(See the service instructions for the torque values.)(See the service instructions for the torque values.)
Plate with white background, red wording.Plate with white background, red wording.
SafetySafety
https://www.forkliftpdfmanuals.com/