EasyManua.ls Logo

OMCA SMF - Transport, Installation, and Electrical Setup; Machine Handling and Transport

OMCA SMF
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
TRASPORTO E
INSTALLAZIONE
TRANSPORT AND
INSTALLATION
6
OMCA S.r.l - Via Curiel, 6 - 42025 - Cavriago (RE) - ITALY
Telefono: +39 0522 943502 / +39 0522 943503 - Website: www.omcasrl.it - E-mail: info@omcasrl.it
ATTENTION: ONLY SPECIALIZED PERSONAL CAN EXECUTE THE
OPERATIONS OF HANDLING AND INSTALLATION OF THE MA-
CHINE, RESPECTING ALL THE SAFETY AND HEALTH REGULA-
TIONS IN FORCE.
ATTENZIONE: LE OPERAZIONI DI MOVIMENTAZIONE E DI INSTAL-
LAZIONE DELLA MACCHINA DEVONO ESSERE EFFETTUATE DA
PERSONALE SPECIALIZZATO, CHE DEVE PROCEDERE NEL PIENO
RISPETTO DELLE VIGENTI NORME DI SICUREZZA E SALUTE.
3. TRANSPORT AND INSTALLATION3. TRASPORTO E INSTALLAZIONE
3.1
3.1 MOVIMENTAZIONE MACCHINA CON IMBALLO
La movimentazione della macchina imballata deve essere effettuata
mediante carrello elevatore o altro sistema meccanico avente
sufficiente resistenza (la macchina con l’imballo pesa circa 330 Kg).
3.1 MACHINE HANDLING WITH PACKING
The machine handling with its package must be done with a lift truck
or other mechanical system having sufficient resistance (the weight
of machine with packaging is about 330 Kg).