OPTO 22 • 800-321-6786 • 1-951-695-3000 • www.opto22.com • sales@opto22.com
© 2023 Opto 22. All rights reserved. Dimensions and specifications are subject to change. Brand or product names used herein are trademarks or registered trademarks of their respective companies or organizations.
OPTO 22 • 800-321-6786 • 1-951-695-3000 • www.opto22.com • sales@opto22.com
© 2023 Opto 22. All rights reserved. Dimensions and specifications are subject to change. Brand or product names used herein are trademarks or registered trademarks of their respective companies or organizations.
PAGE 4
Form 2409-231219
groov
EPIC Learning Center 2 Assembly
PAGE 1
groov EPIC Learning Center 2 Assembly
Form 2409-231219
UNDERSTANDING THE I/O
As you go through online training and review the projects, the following table can help you understand how the load panel is mapped to the modules.
FINISH SETTING UP YOUR LEARNING CENTER
Your groov EPIC Learning Center is now ready to be turned on and programmed. The CODESYS, PAC Control, groov View, Node-RED, and Ignition Edge
software are included with your Learning Center. To finish setting up your groov EPIC Learning Center, scan the QR code to follow the
groov EPIC Learning Center 2 Setup Guide (form 2407) or find it on the Opto 22 website (opto22.com):
For more information about our training offerings, see our groov EPIC Training Series online at training.opto22.com. Our groov EPIC Learning Centers
are also the core of Opto 22 Premium Factory Training classes ($995) held at company headquarters in Temecula, California. To register or for more
information, go to Support > Training on the Opto 22 website (opto22.com).
UNPACKING YOUR LEARNING CENTER
Congratulations on your groov EPIC® Learning Center! To get started, check that you received all the following items:
The following hardware is mounted on the acrylic stand:
The following printed software keys are included:
• groov Activation Key
• Ignition Edge® Development License Key
You need to supply the following:
• An Ethernet cable
• 110 to 240 VAC power
• A network that connects the Learning Center and a computer.
NOTE: To keep the acrylic stand clean and fingerprint-free, use a plastic cleaner (like Plexus® plastic cleaner) instead of a glass cleaner.
After you verify that you have all the equipment, go to the next page to begin assembling your Learning Center!
I/O Mapping
Digital Inputs (GRV-IACDCTTL-24) Digital Outputs (GRV-ODCI-12) Universal I/O (GRV-MM1001-10)
Ch 0: Top push button, latching Ch 0: Blue LED ring around bottom push button Ch 0: ICTD temperature probe
Ch 1: Bottom push button, momentary Ch 1: Sonalert Alarm Ch 4: Resistor in ICTD probe
Ch 6: Light rain status (from DO Ch 3) Ch 3: Light rain Ch 7: Potentiometer
Ch 8: Light rain status (from DO Ch 4) Ch 4: Light rain
Ch 10: Light rain status (from DO Ch 5) Ch 5: Light rain
Ch 12: Light rain status (from DO Ch 6) Ch 6: Light rain
Ch 7: Panel light, Red
Ch 8: Panel light, Green
Ch 9: Panel light, Blue
Ch 10: Output, software driven
Ch 11: Output, software driven
• GRV-EPIC-PR2 (groov EPIC processor) • Module 0, GRV-IACDCTTL-24
• GRV-EPIC-PSPT (pass-thru power adapter) • Module 1, GRV-ODCI-12
• GRV-EPIC-CHS4 (4-module mounting chassis) • Module 2, GRV-MM1001-10
• Load Panel: 1 multi-color LED strip panel light (red, blue, and green); 2 illuminated push buttons; 1 potentiometer; 1 temperature probe
connector; 1 Sonalert alarm
groov EPIC I/O unit mounted on an acrylic stand
ICTD Temperature probe with resistor
12 V Power adapter & cord
groov EPIC Learning Center 2 Assembly
(this document; Form 2409)
Pelican® equipment case