EasyManua.ls Logo

Otodynamics Otoport Advance User Manual

Otodynamics Otoport Advance
296 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Otoport OAE+ABR
Otoport Advance model
Issue 8.1
Otoport OAE
+
ABR
User Manual for Otoport Advance model

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Otodynamics Otoport Advance and is the answer not in the manual?

Otodynamics Otoport Advance Specifications

General IconGeneral
ABRYes
CE-ChirpYes
Automated ABRYes
ConnectivityUSB
StimulusClick, Toneburst
Data TransferUSB
Battery LifeUp to 8 hours
HumidityUp to 90% RH, non-condensing

Summary

Otoport Equipment Identification

Controls, Indicators, and Connections

Identifies and explains the various controls, indicators, and connection ports on the Otoport device.

Otoport OAE+ABR Controls, Indicators, and Connections

Details specific controls, indicators, and connections for the Otoport OAE+ABR model.

Getting Started with Otoport

Assembling the ABR Module with Otoport

Provides step-by-step instructions for attaching the ABR Module to the Otoport unit.

Connecting Probes and Electrodes

Explains how to correctly connect the probes and electrodes to the Otoport module for testing.

Otoport Test Preparation

General Checks Before Testing

Outlines essential pre-test checks for the Otoport and the testing environment for optimal results.

Tip Selection and Probe Fitting

Guides on selecting the correct probe tip and fitting it properly for accurate OAE recordings.

Otoport Test Troubleshooting

OAE Test Problems and Solutions

Addresses common issues encountered during OAE testing and provides troubleshooting steps.

ABR Test Problems and Solutions

Covers potential problems during ABR testing and offers solutions for resolving them.

TEOAE Test Procedures

TEOAE Checkfit Process

Describes the Checkfit screen and its role in assessing test conditions before a TEOAE test.

DPOAE Test Procedures

DPOAE Checkfit Process

Explains the DPOAE Checkfit process, ensuring correct test environment and probe fit.

ABR Test Procedures

ABR Impedance Check

Explains the importance and process of checking electrode impedance for ABR testing.

ABR Checkfit Procedure

Describes the ABR Checkfit procedure to ensure optimal conditions before starting the test.

Otoport Test Setup Configuration

Test Setup Menu Navigation

Provides access to configure various test parameters and modes for OAE/ABR testing.

Test Configuration Parameters

Details how to configure specific test parameters like stimulus level, noise reject, and response window.

Stop Criteria Configuration

Explains how to set and adjust criteria that automatically control test termination.

Automation Settings

Describes how to configure automated test sequences for TEOAE, DPOAE, and ABR tests.

Quality Assurance Area

Probe Test Procedure

Explains how to perform calibration checks on the Otoport probes using a test cavity.

Probe Care and Maintenance

Otoport Care and Handling

Otoport Troubleshooting Guide

Device Calibration Procedures