No.
Item Ref. Illustration Procedure
2-17
16 Sub-deck/
fl
Pinch plate/
‡
Capstan motor
<Disassembly>
Sub-deck/pin plate:
1)Remove the three screws (S2) and slide the sub-
deck in the direction of arrow then remove it. The
pinch plate also detaches at this time.
Capstan motor:
1)Remove the two screws (S6) and remove the cap-
stan motor.
<Assembly>
Do this procedure in the unloading end position.
1)Fit the groove on the rear of the pinch plate into
the boss on the main deck.
2)Reverse the disassembly procedure.
3)Attach the loading gear and arm gear so that the
phase relationship between them is as shown in
the figure.
Fig. 2.6.16 (1)
(
S2
)
(
S6
)
(
S2
)
(
S2
)
(
S6
)
2
2
1
1
3
Pinch plate
Capstan
Motor
Boss
Sub-deck
Attach so that the phase
holes face each other.
Arm gear
Loading gear
— Unloading End Position —
Notes:
• Tighten the screws (S2) of the sub deck in
the order of
1
-
3
.
• The sub deck assembly has undergone per-
pendicularity management after being as-
sembled, so when replacement is required,
it will be necessary to replace the entire
mechanism assembly.
• Capstan motor screws (S6) should be tight-
ened in the order of
1
-
2
and using a secur-
ing torque of 0.20 N·m (2 kgf·cm).
Fig. 2.6.16 (2)
Groove