EasyManua.ls Logo

Panasonic CS-VZ9SKE - Page 165

Panasonic CS-VZ9SKE
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
165
18.3.8 Aluminium Electric Heater Replacement Procedure (Heatcharge)
18.3.8.1 Preparation
1 Power-off the unit (remove plug and/or etc.).
2 Collect all refrigerant into the cylinder by reclaming machine.
3 As brazing work is involved, make sure the workshop and surrounding area is sufficient and safe.
18.3.8.2 Process 1 (Dismatling of the Parts)
1 Remove control-board cover, top plate and front panel, pull out connecting wire, then remove side panel
(right).
2 Disconnect all connectors connected to control board.
3 Remove solenoid coils of 3-way valve, 4-way valve and expansion valve.
4 Remove sound proof material at upper compressor.
5 Remove terminal cover for the compressor.
6 Disconnect of 3 compressor lead wire (red, blue and yellow), and remove control board.
Compressor lead wire
* Aluminum electric heater: part description is aluminum electric heater (Heatcharge)
7 Remove 4 screws (see figure), 1 fixing screw for earth wire, 2 fixing screws for holder plate of 3-way valve &
expansion valve and 1 fixing screw for sound proof board. Slide soundproof board towards to propeller fan
side to remove.
Holder plate for 3-way valve
& expansion valve
Screw for
earth wire
Fixing screw of acoustic
insulation board & holder plate
of 3-way valve & expansion valve
Screw for
soundproof board

Table of Contents

Other manuals for Panasonic CS-VZ9SKE

Related product manuals