For the test operation, press the push buttons in the order shown
POWER-ON COOLING TEST RUN -ON (operated for five to eight minutes) POWER OFF
27.15. CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE
- After completing work, be sure to measure and record trial run properties, and store measuring
data. etc.
- Measured items are room temperature. outside temperature. suction temperature. blow out
temperature. wind speed. wind amount. voltage. current. abnormal vibration. abnormal noise.
running pressure. pipe temperature. withstand pressure and air tight pressure.
- As for structure and appearance, check on the below items.