2. Installation of Front Panel Ass’y
CAUTION:
Opener Lever may be damaged when Front Panel Ass’y is installed,
with Cassette Door-Lid of Front Panel Ass’y and Opener Lever of
Cassette Up Ass’y set incorrectly.
1. When installing the Front Panel Ass’y, swing the Cassette Door-Lid all
the way open until the Cassette Door tab clears the Opener Lever.
2. Make sure that all locking tabs are aligned properly.
Then, press the Front Panel straight in.
Fig. D1
3. Installation of Mechanism Chassis and Cassette Up Ass’y onto Main
C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECT Position.
Fig. D2
15