12.2.4.2 Wire Stripping and Connecting Requirement
W
ir
e
stripping
5mm or
more
(gap between
wires)
No loose strand
when insert
Indoor/outdoor
connecting
terminal board
10 ± 1mm
ACCEPT PROHIBITED
Conductor
over insert
Conductor not
fully insert
Conductor
fully insert
PROHIBITE D
12.2.4.3 Connecting Requirement
For Tank Unit with WH-UD03JE5, WH-UD05JE5, WH-UD07JE5, WH-UD09JE5
The equipment’s Power Supply 1 complies with IEC/EN 61000-3-2.
The equipment’s Power Supply 1 complies with IEC/EN 61000-3-3 and can be connected to current supply
network.
The equipment’s Power Supply 2 complies with IEC/EN 61000-3-2.
The equipment’s Power Supply 2 complies with IEC/EN 61000-3-11 and shall be connected to suitable supply
network, with the following maximum permissible system impedance Z
max
= 0.352 ohm () at the interface.
Please liaise with supply authority to ensure that the Power Supply 2 is connected only to a supply of that
impedance or less.
12.2.5 Charging and Discharging the
Water
Make sure all the piping installations are properly
done before carry out below steps.
12.2.5.1 Charge the Water
For Domestic Hot Water Tank
1 Set the Domestic Hot Water Tank Discharge
(Drain Tap)
to “CLOSE”.
NEPOESOLC
D
o
m
e
stic H
o
t
W
a
t
e
r
T
a
nk
D
isch
a
r
g
e
(
D
r
a
in
T
a
p
)
g
2 Set all Tap / Shower “OPEN”.
3 Start filling water to the Domestic Hot Water
Tank via Tube Connector
c
.
After 20~40min, water should flow out from
Tap / Shower. Else, please contact your local
authorized dealer.
4 Check and make sure no water leaking at the
tube connecting points.
For Space Heating / Cooling
1 Turn the plug on the Air Purge Valve outlet
anticlockwise by one complete turn from fully
closed position.
Plug (turn
anticlockwise by
one complete turn)
Air purge valve
2 Set the Pressure Relief Valve lever “DOWN”.
Lever
Turn down
or
Lever
Turn down
Pressure relief valve
Pressure relief valve
Pressure relief valve Pressure relief valve
3 Start filling water (with pressure more than
0.1 MPa (1 bar)) to the Space Heating /
Cooling circuit via Tube Connector
a
. Stop
filling water if the free water flow through
Pressure Relief Valve Drainage
.
4 Turn ON the Tank Unit and make sure Water
Pump is running.
5 Check and make sure no water leaking at the
tube connecting points.