19
B. Connect hoses to gas source as outlined in Figure 19 and 22 of the Description and Mechanical
Assembly section.
C. Activate gas source.
NOTE
For initial start up of analgesia head, always have a medical gas source shut-off. For multiple
outlet station manifold systems utilizing quick-connect fittings, the analgesia unit can be moved
from station to station without shutting off the medical gas source once pre-operation and
functional tests are completed.
1. Turn on manifold medical gas system as per manufacturer’s instructions. Adjust line pressures
as instructed. Pressure must be 55 PSIG.
2. For portable systems utilizing “E” cylinder tanks, refer to Figure 24.
PRE-OPERATION (cont.)
C. Activate gas source (cont.)