1a. 1b. 1c.
1.
The battery module SL2380 supplies power to the ‘F’ system
ScreenLine motorised blind.
The solar panel SL1084B160 (option) is used to recharge the
battery module SL2380 on a continuous basis.
Wiring and installation must be tted by skilled staff only.
Pellini SpA accepts no liability for damage caused by improper
installation.
INSTALLATION ON THE WINDOW FRAME
2
2.
3. 4.
See p. 14-15