EasyManua.ls Logo

Pentair AUTOTROL Performa 263 - Regeneration time; Days to regenerate (740 time-clock controller only); Calendar override (760 on-demand controller only); Amount of brine used per regeneration

Pentair AUTOTROL Performa 263
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Performa 263-268 / LOGIX 740-760 - Programming
34 / 64 Ref. MKT-IM-011 / A - 15.06.2017
6.3.4. Regeneration time
Set the time when regeneration will take place.
6.3.5. Days to regenerate (740 time-clock controller only)
Set number of days between time-clock regeneration (regen frequency).
6.3.6. Calendar override (760 on-demand controller only)
Set number of days for calendar override on-demand controller.
6.3.7. Amount of brine used per regeneration
Set desired brine amount. 3 salt settings are available on 740 and 760 controllers:
S – Standard Salt – 120 grams/liter of resin.
H – High Salt – 200 grams/liter of resin.
L – Low Salt – 40 grams/liter of resin.
A Press .
→ Regeneration time flashes.
B Adjust displayed time with and .
C Default setting: 2:00am.
D Press to validate the selection and advance to the next
parameter using or .
A Press .
→ Number of days flashes.
B Adjust displayed number with and .
→ Default number: 3 days.
→ Days can be adjusted from ½ (.5) to 99 days.
C Press to validate the selection and advance to the next
parameter using or .
A Press .
→ Number of days flashes.
B Adjust displayed number with and .
→ Default time for calendar override: 0 day.
→ Days can be adjusted from ½ (.5) to 99 days.
C Press to validate the selection and advance to the next
parameter using or .
A Press .
→ Setting flashes.
B Adjust displayed settings with and .
→ Default setting is "S" standard salting.
C Press to validate the selection and advance to the next
parameter using or .

Table of Contents

Related product manuals