EasyManua.ls Logo

Pentair FLECK 5800 SXT - Regeneration Types; Electrical Connections

Pentair FLECK 5800 SXT
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 5800 - SXT - Installation
42 / 92 Ref. MKT-IM-004 / A - 18.04.2017
5.7. Regeneration types
Metered:
The controller monitors the volume of water used. Once it calculates that there is not enough capacity
for the next days operation, a regeneration cycle will be initiated immediately or at a pre-set time.
Immediate control: The controller measures water usage and regenerates the system as soon
as the system capacity is reached.
Delayed control: The controller measures water usage and regenerates the system, at the
specified regeneration time, after the system capacity is reached.
Time clock:
The controller will regenerate based on a set number of operation days.
Delayed control: The controller will regenerate the system, at the specified regeneration time,
when the number of days since the last regeneration equals the regeneration day override value.
Day of the week control: The controller will regenerate the system, at the specified regeneration
time, on each programmed days of the week.
5.8. Electrical connections
Main motor
12 VDC IN
Flow meter
12 VDC
Relay

Table of Contents

Other manuals for Pentair FLECK 5800 SXT

Related product manuals