Installer Manual Fleck 5800 - SXT - Programming
56 / 92 Ref. MKT-IM-004 / A - 18.04.2017
6.5.12. Regeneration time (RT)
Set the regeneration time.
Note
Regeneration time is the time of the day when regenerations occur for delayed regeneration
of any type and calendar override regeneration.
6.5.13. Regeneration cycle step duration
Set the duration in minutes of each regeneration cycle.
Note
Setting a cycle step to 0 will cause the controller to skip that step during regeneration, but
keeps the following steps available.
Note
The different regeneration cycles are listed in sequence based on the regeneration flow
selected for the system.
Note
All cycles can be set from 0 to 199 minutes.
Note
The abbreviations used are listed on chapter 6.5.13.1.
6.5.13.1 Regeneration abbreviations
6.5.13.2 For pre-set regeneration cycles
AA Press or to set the regeneration time.
AB Press to validate the selection and move to the next parameter.
B1 First backwash RF Refill
B2 Second backwash RR Rapid rinse
BD Brine draw SP Service position
BF Brine fill SR Slow rinse
BW Backwash SV Service
LC Last cycles
AC Press or to set the regeneration time.
AD Press to validate the selection and move to the next parameter.