EasyManua.ls Logo

Pentair FLECK 9100 SXT - Volume Since Last Regeneration (VU); Reserve Capacity (RC); Software Version (SV); Resetting the Controller

Pentair FLECK 9100 SXT
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer manual Fleck 9100 SXT - Programming
Ref. MKT-IM-004 / E - 06.10.2020 57 / 108
6.6.5 Volume since last regeneration (VU)
Info
Shows the volume used since the last regeneration (L).
1. Volume since last regeneration display (L or Gal depending on display
format programmed):
6.6.6 Reserve capacity (RC)
Info
Shows the remaining reserve volume until next regeneration (L).
1. Volume until next regeneration display (L or Gal depending on display
format programmed):
6.6.7 Software version (SV)
Info
Shows the version of the software used by the controller.
1. Software version display:
6.7 Resetting the controller
Mandatory
Once you have completed this operation, check all programming steps!
Info
There are two options to reset: partial and hard reset.
Partial reset will set all the parameters to default values, except volume remaining in
volumetric systems and days since last regeneration in time clock systems.
Hard reset will set all the parameters to default values.
6.7.1 Soft reset (SR)
1. Press and hold and for 25seconds while in normal service mode
until SR is displayed.
2. Reprogram all parameters in Master programming mode.

Table of Contents

Other manuals for Pentair FLECK 9100 SXT

Related product manuals