Installer manual Fleck 9100 SXT - Commissioning
Ref. MKT-IM-004 / E - 06.10.2020 61 / 108
Do not let the disinfectant stand for more than 3hours in the brine tank before the regeneration
start.
Dosage
Measure two grains ~0.11mL for 1L.
Brine tank softeners
Backwash the softener and add the required amount of hypochlorite to the well of the brine tank.
The brine tank should have water in it to permit the chlorine solution to be carried into the
softener.
Proceed with the normal regeneration.
7.2.3 Electro chlorination
Valves or systems already equipped with an electrochlorinator device or system will be sanitized
during the brine draw phase.