L-1546 (Rev E) -14-
Commissioning, Start-Up, Operation, Shutdown
Beforeattemptingtostartyourpump,thefollowingmustbeunderstoodandfollowedtoensuresafeoperation.
Information
• When running Hypro centrifugal pumps, it is essential that operators use hearing protection as the sound levels
can reach levels of 80 decibels.
• When handling Hypro pumps, one should wear steel-toed shoes and protective gloves in order to protect the feet
in the event the pump is dropped and protect the hands from any sharp surfaces on the pump or chemicals.
• OnlyauthorizedoperatorshavingtheknowledgeandskillnecessarytosafelyuseaHypropump,orany
equipment the pump is connected to, may run the pump.
• Whensprayingmanually,itisrecommendedthatchemical-resistantfacemasksandclothingbeworntoprevent
anychemicalsfromcomingintocontactwiththeskinorbeinginhaled.
• When spraying manually, always spray upwind of yourself as long as the sprayed chemical will not drift into the
vicinity of other people.
• Wheninstalling,adjustingorremovingaHyprocentrifugalpump,ensurethattherearenoobjectswhichcanfall
ontheinstallerandmakecertainthatallmachinerytowhichthepumpistobeattachedisturnedoff.
• Hypro centrifugal pumps should only be used on tractors or tow-behind spray platforms which have electrically
conductivetiresinordertoreducetheriskofelectrocution.
• NeveroperateaHyprocentrifugalpumpoutsidewhilethereisachanceofgettingstruckbylightning.
• Never leave electrical wires or plumbing components where they can be a tripping hazard or become entangled
inamovingcomponent.Ideally,electricalcables,hoses,pipesandttingsshouldberoutedoverhead.Intheevent
electrical wiring must be routed over the ground, operators are required to use rubber ramps if they cross a gangway.
• Hypro centrifugal pumps should not be used if the ambient light is below 200lux.
Only use approved chemicals in your pump. For a complete list of approved chemicals, see the “Fluid
Pumping Applications” section. Failure to follow this warning will void your warranty and could lead to property
damage, serious injury or death.
Start-up, Operation, Shutdown
Before Starting the Pump
• Ensure all unnecessary personnel are clear of the area.
• Forinitialsetupandtestofyoursystem,itisrecommendedtostartwithcleanwaterinsteadofchemicals,andconrm
thesystemandplumbingconnectionsareleakfree.
• Ensurethatthereisuidinthesourcetankorsupplyline.Donotrundry.
• Checklinestrainerfordebrisorclogs.Removeanyfound.
• Checkallplumbingconnectionstomakesuretheyaretight.
• Checkpowersourceandconnections.
• Checkthatallvalvesandregulatorsaresettothedesiredsettingandarefunctioningproperly.
• Ensure all hoses are properly positioned and are not damaged in any way.
• Ensure PTO shaft shields are in place and are not loose.