EasyManua.ls Logo

Pentair Onga FREEFLO - Cell Housing Installation; Installation no Heater

Pentair Onga FREEFLO
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
FREEFLO Salt Chlorinator Owner’s Manual
The electrolytic cell housing must be plumbed into the return line after the lter. Please see the
installation diagram, g.1, below for the preferred method. If a heater is plumbed into the system
then the cell housing must be installed after the heater in the return line with a check-valve
between the heater and the chlorinator to protect the elements or heat exchanger. If a solar
heating system is installed then the cell housing should be tted after the line going up to the roof
and after the return line coming back from the roof if it rejoins the main swimming pool return.
The cell housing has allocations for either 40mm PVC pipe or 50mm PVC pipe with the use of the
supplied PVC reducing bushes.
INLET
OUTLET
From pool
skimmer /
main drain
To pool
return jets
Backwash
to sewer
CELL HOUSING INSTALLATION
Installation No Heater
- - Please note the installation position of the electrolytic cell for water probe positioning - -
Fig.1
Fig.2

Related product manuals