Posi-Chlor® Salt Water Chlorinator Owner’s Manual Posi-Chlor® Salt Water Chlorinator Owner’s Manual
11
3. INSTALLATION OF THE EQUIPMENT
2. When the saddle clamp is in position, drill a hole in the PVC pipe. Using the threaded port
as a guide. Use a 10mm drill bit, careful not to touch the threads.
3. Connect one end of the suction tube (4) to the peristaltic pump (3) inlet.
4. Connect the other end of the suction tube (4) to the suction filter (7).
5. Place the suction filter (7) inside the ACID drum.
6. Connect one end of the injection tube (5) to the peristaltic pump (3) outlet.
7. Place the pipe adaptor and injector (8) inside the saddle clamp's threaded port.
8. Connect the other end of the injection tube (5) to the injector (8).
3.5 ADVANCED kit (pH/ORP)
The equipment continuously measures the bactericide level of water through this probe, by
means of an "ORP" probe. Simply adjust the required level and the equipment automatically
maintains the level of disinfection by adjusting the production of chlorine to the real needs
of the swimming pool. The screen shows the ORP level (bactericide capacity) present in the
swimming pool.
The ORP (Oxidation Reduction Potential) is the electrical voltage that indicates the oxidation
capacity or reduction of a solution. In swimming pools, the oxidation capacity is directly
related to the bactericide power of the water, which is directly related to the concentration
of free chlorine in the pool. This probe enables you to adjust the equipment in AUTOMATIC
operating mode.
1. Place the saddle clamp (12) in the pipe as indicated in the hydraulic connection diagram.
The saddle clamp (12) corresponds to the PH probe and should be connected before the
electrolysis cell and after the filter. Make sure the o-ring is in the groove on the top of
the clamp, sealing the pipe to the saddle clamp.
2. When the saddle clamp is in position, drill a hole in the PVC pipe. Using the threaded port
as a guide. Use a 10mm drill bit, careful not to touch the threads.
3. Place the probe holder (11) inside the flange (12).
4. Place the PH probe (9) inside the probe holder (11).
5. Place the PH probe (9) connector in the BNC connector on the base of the control centre.
6. Place the saddle clamp (13) in the pipe as indicated in the hydraulic connection diagram.
The saddle clamp (13) corresponds to the ORP probe and should be connected before the
electrolysis cell and after the filter. Make sure the o-ring is in the groove on the top of
the clamp, sealing the pipe to the saddle clamp.
7. When the saddle clamp is in position, drill a hole in the PVC pipe. Using the threaded port
as a guide. Use a 10mm drill bit, careful not to touch the threads.
8. Place the probe holder (11) inside the flange (13).
9. Place the ORP probe (10) inside the probe holder (11).
10. Place the ORP probe (10) connector in the BNC connector on the base of the control
centre.