EasyManua.ls Logo

Perel BG58000V2 - Page 3

Perel BG58000V2
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BG58000V2
V. 01 14/09/2022 3 ©Velleman Group nv
5. Installation
1. Measure the actual hole distance according to the back plate.
2. Drill the holes accordingly (depth 70 mm, Ø 12 mm).
3. Fix an anchor inside each hole and use a spanner to fasten the drop box.
6. Cleaning and Maintenance
Occasionally wipe with a damp cloth to keep it looking new. Do not use harsh chemicals,
cleaning solvents or strong detergents.