Performing a Physical Space Assessment
IntelliVue Telemetry System Infrastructure Installation and Service Guide 2-13
Switch groupings may have to be placed in multiple locations along the length of the
coverage area, and the POE/Sync Units may not be fully loaded with all 12 ports in
use.
So the general AP supporting infrastructure methodology is the deployment of POE/
Sync/Network Switch “stacks” within the site's available equipment closet
locations. Obviously, each Network Switch has to have a connection back to the
main network infrastructure and other non-AP supported devices (central stations,
bedsides, etc.) may be plugged into a Network Switch used to support the APs.
Sync Units are required for any installation of two or more APs.
Defining the UPS Deployment
Because a reset of any of the ITS infrastructure devices can result in the loss of
patient waveforms for several minutes, we require that the following ITS devices be
connected to an Uninterruptible Power Supply (UPS) and also be on emergency
hospital power:
• Network Switches & Routers
• Power Over Ethernet Units
• Sync Units
• Access Point Controllers
The UPSs supplied as part of the ITS infrastructure provide up to 300 W (500 VA) of
backup power. When determining the number of UPSs required to support your
planned ITS deployment, consider the ITS device power draws listed in Table 2-4.
Figure 2-12: Maximum AP to Switch Cable Length
Table 2-4: ITS Infrastructure Device Power Draws
Product Number Device Power in Watts
862114 Sync Unit 10 Watts
862152 POE – 12 Port 165 Watts
862149 POE – 6 Port 90 Watts
862161 Cisco 2950 Switch: Copper 30 Watts
862162 Cisco 2950 Switch: Fiber 30 Watts
862084 HP 2524 Switch 36 Watts
862163 Cisco 3550 Router: Copper 65 Watts