EasyManua.ls Logo

Philips IntelliVue Telemetry System Infrastructure - Completing ITS Installation Worksheets

Philips IntelliVue Telemetry System Infrastructure
180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Completing ITS Installation Worksheets
IntelliVue Telemetry System Infrastructure Installation and Service Guide 2-25
For example, if DECT phones are present at the site and occupy only the upper ¾ of
the available spectra, choosing channels on the low end (1-9) of the available range
is best.
If the spectra is clean other than a nearby microwave that the spectrum analysis
shows radiates in the low end of the spectrum, you should select channels in the
upper end of the spectrum for the 2.4 GHz ITS.
Completing ITS Installation Worksheets
As part of the planning process for your ITS deployment and prior to installing any
components, be sure to photocopy and complete the following ITS installation
worksheets:
ITS Infrastructure Equipment Summary Table (page 2-26)
ITS Access Point Equipment Summary Table (page 2-26)
APC Configuration Worksheet (page 2-29)
1.4 GHz Default AP Configuration Worksheet (page 2-32)
2.4 GHz Default AP Configuration Worksheet (page 2-33)
AP Group Configuration Worksheet (page 2-35)