EasyManua.ls Logo

Philips Senseo Latte Duo - Sensor and LED Test Mode

Philips Senseo Latte Duo
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HD7857/20 / HD7857/21
10-24
Sensor & LED test
To validate the assembly and electrical correctness of an appliance, especially during testing and debugging phase, a sensor
and LED test is very useful. Please keep in mind that it is not an automated test and only intended as indication.
Test-step 0: Entry to test mode
1. Connect mains;
2. After 0.5 second and before 1.5 second operate Button 2, On/Off button and Button 5.
3. Release all switches.
4. All LEDs will be ON for 1.0 seconds and after that switch to OFF again.
Test-step 1: Button identi cation
1. Manually operate a button.
The related LED - refer to the table below - will be ON.
2. Release the button.
The related LED - refer to the table below - will be OFF.
Sensor LED LED on LED off
Decal button Decal LED Button pressed Button released
Button 1 1-cup LED Button pressed Button released
Button 2 1-cup LED Button pressed Button released
Button 3 1-cup LED Button pressed Button released
On/Off button On/Off LED Button pressed Button released
Button 4 2-cup LED Button pressed Button released
Button 5 2-cup LED Button pressed Button released
Button 6 2-cup LED Button pressed Button released
Test-step 2: Entry sensor mode
1. Operate Button 2, On/Off button and Button 5.
2. Release all switches
3. All LEDs will be ON for 1.0 seconds and after that switch to OFF again.
Test-step 3: Sensor identi cation
1. Manually operate a sensor.
The related indicator - refer to the table below - will be activated.
2. Release the sensor.
The related indicator - refer to the table below - will be deactivated.
Sensor LED LED on LED off
NTC Boiler On/Off LED NTC error NTC OK
NTC Thermo block Decal LED NTC error NTC OK
Water level sensor 1-cup LED Water present Water low or no water present
Brew head sensor 2-cup LED Brew head closed Brew head open
Test-step 4: End test
1. Disconnect mains end test program
• Boiler reset
Boiler reset-step 0: Entry to boiler reset mode
1. Connect mains.
2. After 0.5 second and before 1.5 second operate Button 3 and Button 4.
3. Release all switches
The On/Off LED will blink fast for 0.5 second.
REPAIR INSTRUCTION

Related product manuals