EasyManua.ls Logo

Pichler LG Series User Manual

Pichler LG Series
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Systematic ventilation.
OPERATING AND
INSTALLATION INSTRUCTIONS
LG 750 LG 6000
EU-Regulation
1253/2014
for residential buildings
EN13141-7:2010
ErP
2018
Ventilation and
air conditioning /
TÜV-certified design
COMFORT
VENTILATION

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Pichler LG Series and is the answer not in the manual?

Pichler LG Series Specifications

General IconGeneral
BrandPichler
ModelLG Series
CategoryFan
LanguageEnglish

Summary

Functioning of the Ventilation System

Functional Overview

Overview of the ventilation system's functions.

System Description

Detailed description of the ventilation system.

System Extensions for Heat Exchanger Frost Protection

Extensions to protect the heat exchanger from freezing.

Optional: System Extension for Auxiliary Heating

Optional extension for auxiliary heating.

Optional: System Extension for Cooling

Optional extension for cooling.

Heat Exchanger

Details about the heat exchanger.

Optional: Demand-Driven Plant Operation

Optional demand-driven plant operation.

Optional: Building Automation - Networking

Options for building automation networking.

Frost protection via heat exchanger bypass

Describes frost protection using a heat exchanger bypass.

Frost protection via water pre-heating exchanger (optional)

Frost protection using a water pre-heating exchanger.

Frost protection via electric pre-heating exchanger (optional)

Frost protection using an electric pre-heating exchanger.

Post heating via pumped hot water re-heating exchanger (PWW-NHR)

Post heating using a pumped hot water exchanger.

Re-heating using electrical heating

Re-heating using electrical heating.

Cooling with water cooling exchanger

Cooling using a water cooling exchanger.

DX cooling (cooling unit)

Cooling using a DX cooling unit.

Constant CO₂-/RH value

Demand-driven ventilation based on CO2/RH levels.

Fan optimiser

Optimizing fan speed based on air flow signals.

Green Zone/Pl zone modules, Pl optimisers

Zone control for demand-driven ventilation.

Übersicht Pl-Air-2 Funktionen

Installation

Prerequisites for Installation of the Unit / Interior Installation

Prerequisites for unit and interior installation.

Unit Installation

Instructions for unit installation.

Legend for the Symbols Used

Explanation of symbols used in the manual.

Sealing

Guidance on sealing during assembly.

Installation site

Specifies suitable locations for unit installation.

Connection facilities

Lists required connection facilities in the installation area.

Before installing

Tasks to complete before starting installation.

Protection against dirt

Measures to protect the unit from dirt ingress.

Making the condensate water connection

Instructions for making the condensate water connection.

Electrical connection

Connection to Web Server (Optional!)

Connecting the unit to a web server for remote control.

Connecting the Operating Unit

How to connect the operating unit (PI-HMI) to the system.

Installation on Flat Surface

Method for mounting the PI-HMI on a flat surface.

Installation in Wall Box/Panel Front

Method for installing the PI-HMI in a wall box or panel.

Modbus Connection

Details on establishing a Modbus connection.

Modbus RJ12 6P6C

Specifics of connecting via RJ12 6P6C port.

Modbus Screw Terminals

Specifics of connecting via Modbus screw terminals.

Mains Connection

Instructions for connecting the unit to the mains power supply.

Introduction

General

Use in compliance with the intended use

Defines the intended purpose and application of the ventilation unit.

Liability

Warranty

Safety

Symbols Used

Explanation of safety symbols used in the manual.

Safety Regulations

General safety regulations and precautions.

Setting Up the Unit

Guidelines for physically setting up the ventilation unit.

Electrical Connection Work

Safety precautions for electrical connections.

Operation of the System

Safety considerations during system operation.

Customer service

Ventilation unit design

Description

General description of the ventilation unit's features.

Unit housing

Details on the unit's construction and housing.

Heat recovery

Explanation of the heat recovery system.

Fans

Information about the fans used in the unit.

Outdoor air filters- (ODA-filter)/ Extract air filters (ETA-filter)

Details on air filters for outdoor and extract air.

Integrated control and regulation

Explanation of the integrated control system.

Unit Layout with Fittings LG 750 and LG 6000

Diagram and layout of the unit with fittings.

Heat exchanger arrangement

Describes the arrangement of heat exchangers in different unit types.

Control unit

Home Screen

Description of the control unit's home screen interface.

Main Menu

Overview of the main menu options on the control unit.

Communication

Settings for communication and network configuration.

Weekly programm

Setting up weekly ventilation programs.

Alarms

Viewing active alarms and the alarm log.

Extended operation

Options for overriding weekly programs for short periods.

Components

Overview and settings for various system components.

Software update

Instructions for checking and performing software updates.

Settings

Various settings including language, time, and adjustment.

Messages / Faults

Alarm Display

How active alarms are displayed on the unit.

Optional: Alarm Log in the Web-Server

Accessing the alarm log via the web server.

Filter maintenance

Maintenance Instructions (Filter)

Guidelines for regular filter inspection and replacement.

Filter Message on the „PI-HMI"

How filter warnings are displayed on the control unit.

Filter message on the web server

How filter messages appear on the web server.

Clearing Filter Messages

Procedure for resetting filter change messages.

Filter Changing

Detailed steps for replacing the air filters.

Scope of supply, transport, storage and disposal

Scope of Supply

Lists the items included in the unit's delivery.

Packaging & Transport

Guidelines for handling and transporting the packaged unit.

Storage

Recommendations for storing the ventilation unit.

Disposal

Information on environmentally friendly disposal of the unit.

Technical specifications

Shutdown/Maintenance/Cleaning

Factory Customer Service

Contact information for factory customer service.

Maintenance Instructions for the Specialised Company

Maintenance tasks for qualified personnel.

Outdoor and extracted air compact filters

Maintenance of outdoor and extract air filters.

Fans

Maintenance procedures for the unit's fans.

Counter-current plate heat exchanger with bypass flap

Maintenance of the heat exchanger with bypass flap.

Pre- and re-heater battery

Maintenance for pre- and re-heater batteries.

Servomoteurs

Maintenance for servo motors.

Maintenance Chart

Initial startup

Basic Procedure for Commissioning by a Specialist

Step-by-step guide for initial system commissioning.

Connecting Air Ducts and Components

Procedures for connecting air ducts and system components.

Installation / Operation from the web server

Spare parts and accessories

Subject to change

Related product manuals