U S
MAIL
U S
MAIL
STEP 2 Slide Mailbox Post Sleeve over 4x4
treated pine post.
STEP 5 Using the (4) #12 x 1" screws
C
secure the
Mounting Bracket to the Post Sleeve. Do not over
tighten screws.
STEP 3 Secure the Mailbox Post Sleeve section
to the 4x4 treated pine post using the (4) #12 x 1"
screws
C
included in the kit. The Plastic post
has (4) Mounting Holes located approximately
23 inches above bottom of post.
STEP 6 Assemble your mailbox by using (2) pins
to attach Mailbox Door to holes in Mailbox Body.
Pins can be snapped into place by pressing rmly
with thumb or tapped in using a rubber mallet.
TIP: Make sure the pins are fully snapped into
place. If they are installed correctly, you will not
be able to remove the pins with your ngers.
STEP 4 Attach Mounting Bracket to top of
Mailbox Post Sleeve.
STEP 7 Place Mailbox on to top of Mailbox Post
Bracket, align holes of mailbox & bracket and
secure with (4) 24 x 1-1/2" Phillips Machine Bolts
A
and nuts
B
.
C
4x
C
A
Postal Pro is a Creative Solutions, LLC Product
Manufactured in Purvis, MS
Customer Service 877-544-5220
customerservice@creativesolutionscp.com
www.postalpromailboxes.com
04/22