EasyManua.ls Logo

Precor Discovery Series - Page 10

Precor Discovery Series
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bolt the equipment to the floor
Precor recommends that the strength equipment be bolted down at all anchoring
points. Bolting is made possible by removing the end caps at the frame base and
exposing the mounting holes that accommodate the bolts (see the accompanying
figure). Replace end caps when bolting is complete.
Important As floor materials vary, it is important that you consult a licensed contractor
to advise you on proper bolting techniques and appropriate fastener types.
Standards occasionally change or are updated. Precor recommends that you keep
apprised of your local industry standards. Precor shall not be held liable for failure to
properly bolt the strength equipment to the floor.
Attach the shroud to the weight stack
CAUTION
stack shroud components. Using power tools may void the Precor
A Shroud Assembly Guide is included with your equipment. Please refer to these
instructions to attach the plastic shroud to your weight stack.
Verify operation of the equipment
Once assembly is complete, verify safe operation by checking the following points:
Cable tension is correct and the cable is moving smoothly on its pulleys.
The movement arm is stable and moves smoothly through its range of
motion.
CAUTION
If the cable does not slide smoothly throughout its path, stop
equipment use immediately and recheck the cable assembly.
11

Other manuals for Precor Discovery Series

Related product manuals