both Generator and Source Power
Note: You will need a short piece of
gauge wire to complete this
tions completely before starting
source and be sure generator is off.
Locate transfer switch box.
from transfer box and remove the
output cable. This cable will now be the output from the EMS control box.
etermine where the EMS control box and remote
taking into consideration the output cable length.
Measure the distance between t
he transfer switch and the EMS control box
input (L1 side) and add one foot. This is the length of cable that will be
the installation. Make sure a 6
r cable and strip back one end
d removed from the transfer box.
Strip back all conductors
inch. Attach ring terminals to green wires.
with the solid wire itself.
Take the jumper cable with 3¼ inch conductor strip, and slide it through the
input side of the EMS con
to ground screw and tighten each set
The cable that was removed from the transfer sw
itch connects to the output
) in the same manner with the follo
wing exceptions. A) Insert the
Black wire thru the current sensor with the green tape on it. B) Insert the
Red wire thru the other current sensor. Make sure that the wire colors
match across the contactor (relay) from each other.
from transfer box to 3¼ inches if needed.
Connect the loose end of the jumper cable to the transfer switch. See wiring
diagram on the transfer switch if needed.
Double check all connections and make sure they are secure.
over outer jacket. Do not
his could bite through insulation and cause a short.
Set time delay jumper on the circuit board. Factory setting is for 15 seconds,
pull head of jumper (J6 on circuit board by
left side of display socket) to
set for 136 seconds. See features section on time delay to determine
display card, with display facing you and
digits reading correctly,
with the six black machine scre
is complete. Plug in and follow instructions.