EasyManua.ls Logo

QubicaAMF 400288005 - How to Replace the 4 HD;5 HD-CPU Unit

Default Icon
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BES X installation manual Conqueror Pro procedures
P/N: 400288005; Rev: L, 09/21 135
18.3 How to replace the 4HD/5HD-CPU unit
Turn off the pair of lanes where the faulty 4HD/5HD-CPU is installed by unplugging the power cord from the
4HD/5HD-HUB unit.
Disconnect and remove the faulty 4HD/5HD-CPU;
Connect the new 4HD/5HD-CPU in the same way as the old one. Check that all the cables are connected;
Turn on the pair of lanes by plugging in the power cord to the 4HD/5HD-HUB unit;
Wait until the boot-up image is displayed on the lane monitors;
Read the serial number written on the lane monitors;
Enter Conqueror Pro with a user allowed to access the Lane Control Box Replacement;
Enter Conqueror Pro with a user allowed to access the Lane Control Box Replacement, navigate through the
main menu and select: Setup / Technical Setup / Lane Control Box Replacement.
Insert the serial number, retrieved from the lane monitors,
inside the Lane Control Box Replacement window and, if
necessary, click on the Lanes Selected field.
Select the destination lanes of the 4HD/5HD-CPU and press OK.
Click OK.
Click on Yes when the Warning message appears.
Wait for Conqueror Pro to process the request;

Table of Contents