EasyManua.ls Logo

Radio Shack PRO-106 - Scanner Setup; Listening Safety; Transferring Data To or From another Scanner or PC; Turning on the Scanner and Setting Squelch

Radio Shack PRO-106
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
ALIGNMENT AND ADJUSTMENT
ALIGNMENT AND TEST POINT
ALIGNMENT PREPARATION
Test Equipment Required
z Oscilloscope
z DC SSVM
z FM signal generator
z Frequency counter (800 MHz)
Notes:
z Use non-metallic tuning tools.
z The test equipment and receiver should be warmed up for at least 10 minutes before proceeding with alignment.
z The signal level from the generator should be kept as low as possible to obtain a usable output.
z To tune the frequency, press TUNE, frequency number including decimal point, then press ENT.
If you make a mistake, press CL to delete a single digit or hold CL about 2 seconds to start over.
L26
L24
L23
TP1 TP2
TP3 TP6 TP5 TP4
VR2
VR4
VR5
VR3
T4
Linear PCB

Other manuals for Radio Shack PRO-106

Related product manuals