EasyManua.ls Logo

RAS MULTIBEND 9000 - Page 63

Default Icon
263 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ffAS
Proceed
as
follows
-
Reactivate
the
main supply
line.
-
Turn
the main
switch
on the rear
panel
of the
switchgear
cabinet
to ON.
-
Check whether
the CNC control
is
ready for
operation
Ready
for operation
when:
pushbutton
on
the control
screen
lights
up and
all other lamps
are switched
otf.
At the same
time, both
of the
softkeys
must
be displayed
on the
monitor, accompanied
by
instruction
texts.
-
Switch on
the
keylock switch
for the
controller
and tum
off again
immediately
with the
pushbutton.
ENTION!
IMPORTANT:
Only
switch on
very briefly
as the
pump
may be damaged
if
the
direction of
rotation
is incorrect.
The direction
of rotation
must comply
with the arrow
shown
on the
motor
(looking
at the ventilator
cowl,
clockwise,
to the
right). lf the
direction of
rotation is correct
forthe
main
motor, the direction
of rotation
will
also
be correct for
all other
motors in
the system.
Before
setting
to
work, due
to eventual
mains
fluctuations,
adjust the
control-voltage
110V,
at
secondary
winding
in the range
of +5T"
up to +1
07"
(1
1 SV up
to 1 23V).
(Measure
at secondary
winding
of transformer,
adjustment
by means of
changing
terminals
at
primary
winding).
RAS 74.20-40
MULTIBEND
9OOO
ELECTRICAL
EQUIPMENT
f
SERUICE
T\..tZ
August
11,1994
5-5

Related product manuals