EasyManua.ls Logo

Raven Hawkeye - Page 22

Default Icon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
18 AGCO RoGator C-Series RG900, RG1100, RG1300 Hawkeye® Installation Manual
2. The locations listed below require that the Hawkeye
®
NCV is installed in the rear position and the ProStop-E is
in the forward position, closest to the boom tube:
Just below the secondary boom fold cylinder, base end.
FIGURE 6. Cylinder Base End Installation
The last nozzle body before the break away section.
FIGURE 7. Break Away Section Installation
BUMPER INSTALLATION FOR C-SERIES MACHINES WITH PROSTOP-E VALVES AND WILGER NOZZLE BODIES
1. Locate the boom stops and remove the existing hardware. Keep the existing washers and nuts.

Table of Contents

Other manuals for Raven Hawkeye

Related product manuals