P/N 016-0171-584 Rev. D 93
Walk-Around
Inspection of System
Cables and
Components
Weekly/as
needed
1. With the system power on, ensure all Hawkeye NCV LEDs
are flashing. If not, check the cable connections to the NCV’s
and the fuses in the fuse block located near the boom on
the chassis cable harness.
2. Verify the boom cables are securely fastened to the boom
and are not hanging below the lower boom tube.
3. Inspect each NCV for damage and proper installation on
the nozzle bodies.
4. Verify that the Hawkeye CANbus terminators (located on
the boom cables on each boom tip) are present and
securely tied to the boom cables.
NCV Seal
Replacement
After 500 hours
1. Turn off the Hawkeye system and product pump.
2. Bleed any remaining pressure from the boom system.
3. Perform the Nozzle Control Valve maintenance
procedure(page 94).
Inspection Frequency Procedure

Table of Contents