EasyManua.ls Logo

Raven RCM-Sprayer Hawkeye 2 - Pressure Setup

Default Icon
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
30 RCM - Sprayer and Hawkeye® 2 Calibration and Operation Manual
Tank Level Percentage. Percentage of the total tank volume remaining in the product tank.
Area. The field area covered during the current field application.
Total Volume Applied. The total product volume applied for the specific product displayed.
Volume per Minute. The instantaneous rate of product applied during field applications.
NCV2 Max Duty Cycle. Highest duty cycle percentage for NCV2s on the system.
NOTE:Max Duty Cycle is not available in the Bypass NCV2 control mode.
NCV2 Min Duty Cycle. Lowest duty cycle percentage for NCV2s on the system.
NOTE:Min Duty Cycle is not available in the Bypass NCV2 control mode.
NCV2 Avg Duty Cycle. The average duty cycle for all NCV2s on the system.
NOTE:Avg Duty Cycle is not available in the Bypass NCV2 control mode.
NCV2 Efficiency. The NCV2 Efficiency value compares the expected and actual system values
for a tip size for the following parameters: NCV2 duty cycle, flow rate, and pressure.
NOTE:NCV2 Efficiency is not available in the Bypass NCV2 control mode.
Pump RPM. The RPM of the product pump (if available and configured).
Active Control Mode. The active system NCV2 Control Mode and Section Control Mode.
PRESSURE SETUP
To adjust pressure settings:
1. Open the UT Menu and select the RCM - Sprayer Menu button.
2. Select the Tools Menu softkey along the right side of the display.
3. Select the System Settings tab along the top of the display.
4. Select the Pressure Setup button on the System Settings page. The following pressure settings will be available:
RCM - Sprayer Menu Tools Menu System
Settings
UT Menu
Pressure
Setup

Table of Contents

Related product manuals