The following steps must be completed to install a Raven Sidekick Pro injection system:
1. Select and plumb the point of injection. See page 10.
a. Install carrier and chemical injection check valves.
b. Install in-line mixer.
2. Mount the Sidekick Pro injection module or tank. See page 12.
3. Mount the Sidekick Pro injection pump. See page 13.
4. Plumb the Sidekick Pro pump and injection lines into the main carrier line at point of injection. See page 15.
5. Install the closed calibration system. See page 15.
6. Plumb the recommended rinse system. See page 16.
7. Connect the Sidekick Pro injection pump to CANbus. See page 18.
8. Connect the Sidekick Pro pump to source of electrical power. See page 18.
The following sections provide detailed information and procedure to assist with completing the above steps.
Contact a local Raven dealer for assistance or questions during the installation procedure.
FIGURE 1. Example Sidekick Pro Injection System

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals