EasyManua.ls Logo

Raven Sidekick Pro - Required Components and Tools

Raven Sidekick Pro
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3
8 RCM - Sprayer with Sidekick Pro™ ICD Ratio Rate Quick Installation Reference
Mount the Sidekick Pro™ ICD in a location which provides access to the pump and ECU to simplify calibration
and troubleshooting.
NOTE: Length of cabling may dictate available mounting locations. The following figures offer some
examples of how to mount the Sidekick Pro™ ICD injection module.
FIGURE 3. Sidekick Pro™ ICD Injection Module
FIGURE 4. 90° Push-In Fitting
Insert 8mm tube (P/N 333-0014-005) at the push-in fitting and connect to the point of injection at the mixer.
90° Push-In 8xR1/2
(P/N 333-0014-002)
90° Push-In 8xR1/2
(P/N 333-0014-001)
To Point of Injection

Other manuals for Raven Sidekick Pro

Related product manuals