S-650: Place a 2400 l/h (600gph) feeding pump for the chiller in the accessory compartment (left side) of
the sump and connect with flexible piping to the inlet of the chiller. Connect the outlet of the chiller to the
inlet of the chiller return pipe that is attached to the rear wall of the sump compartment. Add an extra piece
of flexible pipe from the outlet of the chiller return pipe to the downpipe chamber of the sump with the
flexible pipe ending under the water.
Heaters and other accessories (such as a calcium reactor) can be placed in the accessory compartment.
Water to feed accessories can be taken by replacing the ¾” plug in the main pump manifold with a suitable
hose barb and adjusting the flow as required with the valve.

Other manuals for Red Sea MAX S LED Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Red Sea MAX S LED Series and is the answer not in the manual?

Red Sea MAX S LED Series Specifications

General IconGeneral
BrandRed Sea
ModelMAX S LED Series
CategoryOther
LanguageEnglish

Related product manuals