EasyManua.ls Logo

Regal LS6 - Chapter 6 Vessel Operation; Getting Underway Procedures

Default Icon
325 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
141
Chapter 6
Vessel Operation
Getting Underway
Pre-departure Questionnaire
• Have all fl uid levels been topped off?
• Is the fuel tank full?
• Is all safety equipment accounted for and easily
accessible?
• Are navigation lights and horn operating properly?
• Is the bilge free of water and does the bilge pump
operate?
• Is the engine and propeller in good working
condition?
• Is the drain plug in place ?
• Have all passengers been briefed on emergency
procedures and seated for departure? Is the boat
load balanced?
• Is the operator sober, alert and ready to skipper
the vessel?
• Have all passengers been fi tted for life jackets?
• Has a float plan been filed and left with a
component person?
• Has the bilge been sniffed and the fuel system
leak checked?
• Are sea cocks open (if applicable)?
• Is all communication equipment in good operating
condition?
• Has a second person been briefed on operational
procedures should the skipper become disabled?
• Are all gauges and electrical switches functioning
properly?
• Has weather information been gathered and
analyzed?
Underway Questionnaire
• After casting off have all dock lines and fenders
been stowed?
• Are all passengers seated and all doors closed
and latched?
• As skipper are you monitoring the dash gauges
and/or Garmin plotter for changes?
• As skipper are you on the lookout for changing
weather?
• Is the remote control safety lanyard tightly secured
to your belt or clothing?

Related product manuals