Steps 12, 13 and 14
connect power cable and tank sensor cable
cable tie power cable
14. Cable Tie Power Cable: Position the power cable firmly against the outside lower left hand side of the
control board chassis and cable tie in position. The cable tie is to fit in the recess at the front edge of the
chassis and through the adjacent slot.
15. Electrical Cover: Replace the electrical cover, engaging the bottom of the cover into the slots on the
supporting bracket.
Secure at the side with the mounting screw.
16. Condensate Drain: Install a drain line to the condensate drain to carry the discharge clear of the water
heater. Refer to “Condensate Drain” on page 33.
17. Water Connections: Connect the cold water supply and the hot water pipe work to the water heater.
Connect the temperature pressure relief valve and its drain line.
Refer to “Connections – Plumbing” on page 32
18. Water Supply: Turn on the cold water supply and fill the water heater.
Check the pipe work and the inlet and outlet connection points of the flexible hoses for leaks.
Refer to “To Fill And Turn On The Water Heater” on page 39, however the electrical supply should not
be switched on at this stage.
19. Air Louvre Attachment: Replace the two air louvres, ensuring the longer skirt of the louvre is orientated
to the bottom and re-fit all twelve (12) louvre attachment screws.
20. Electrical Connection: Refer to “Connections – Electrical” on page 34.
21. Commissioning: Refer to “Commissioning” on page 39.