2.2 INSTALLATION AND SET-UP OF GBC STREAMPUNCH III
RECOMMENDATIONS:
• Use Jogger Unit Type 1075 – EDP 411206. This will improve the stack quality.
INSTALLATION KIT CONTENTS – FOR MT-C3 AND VENUS
• EPROM (For SR841 Finisher)
P/N C6847007
• Finisher Communication Cable
Assembly, P/N C6847002A
• Finisher to Printer Cable (longer
version) P/N C6847101
• GBC StreamPunch Interconnect
Communication Cable, P/N
VRC51278
• Power Cable
• Warning Label (to be added to
printer)
• Wire Tie Wraps included
• Instruction sheet P/N 7706304
(Repeated here for the
convenience of the technician)
UNPACKING
• Inspect the outside of the package for shipping damage. If there is evidence of shipping
damage, contact the shipping carrier immediately.
• Remove the punch from its shipping carton. Three people are recommended, one lifting at the
casters while two lift at the top cover. DO NOT lift using the front door panel.
• Inspect for any concealed damage to unit. If there is evidence of concealed shipping damage,
contact the shipping carrier immediately.
• Remove all shipping tape from doors and levers.
UNIT SET-UP
Reference the following pages to assist you in identifying the proper location of the cables,
sound deadening foam and finisher docking brackets. Improper connection of any of the
following cables will result in improper communication between the Printer, Finisher and
StreamPunch which result in one or more problems.
FINISHER PREPARATION
Remove the Input Guide from the Finisher. Install new EPROM for the Finisher.