Bridge Unit (B227)
SM 1-21 G133
Installation
7. Install the bridge unit [F].
8. Open the bridge unit cover [G]
9. Secure it with screw [H] and knob screw [I].
10. Reinstall the operation panel cover [J] ( x 1, x 1, hook).
11. Close the bridge unit cover [K].
Keep the bridge unit cover [K] open during installing the operation panel cover.
Otherwise, you cannot reinstall it.
12. Reassemble the machine.
13. Install the optional finisher (refer to the finisher installation procedure).