001 Fusing: Center -
[–20 to 250 / 0 / 1 deg/step]
The heating roller has two lamps. One heats the
center of the heating roller and the other heats both
ends of the heating roller.
002 Fusing: Ends - [–10 to 250 / 0 / 1 deg/step]
The heating roller has two lamps. One heat s the
center of the heating roller and the other heats both
ends of the heating roller.
003 Pressure -
1108
[Forced Ready Setting]
Japan use only
007 Time *ENG [22 to 60 / 22 / 0.1 sec/step]
1109 [Fusing Nip Band Check]
001 Execute -
[0 or 1 / 0 / 1]
Executes the nip band measurement between
fusing belt and pressure roller.
If the nip band width is not 8 mm, and fusing is
not good, replace the pressure roller or install a
new fusing unit.
002
Pre-Idling Time *ENG [0 to 120 / 0 / 1 sec/step]
Specifies the fusing rotation time before executing SP1109-001.
003
Stop Time * ENG [5 to 30 / 10 / 1 sec/step]
Specifies the time for measuring the nip.
1112 [Environmental Correction: Fusing]
001
Temp.: Threshold: Low *ENG [10 to 23 / 17 / 1 deg/step]
Specifies the threshold temperature for low temperature condition.
002
Temp.: Threshold: High *ENG [24 to 40 / 30 / 1 deg/step]
Specifies the threshold temperature for high temperature condition.
8. Appendix: SP Mode Tables
156