EasyManua.ls Logo

Ricoh pro c901 - Page 238

Ricoh pro c901
586 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Bulletin PAGE: 5/6
Model: Aries-P1.5 (M077) Date: 25-Nov-11 No.: RM077052
Step 4 Docking the GBC StreamPunch to the G178/D095/M077/D016 copier/printer
4.1. To decrease the height of the StreamPunch, loosen the 4 nuts [A] on the top of the
plate (2 on the front, 2 on the rear) so that the space between the nut and the plate
is approximately 2mm. Then, turn the bottom bolt (immediately above the caster)
clockwise so that it is in contact with the plate.
4.1. Dock the GBC StreamPunch with the mainframe and set the fixing pin [C].
Note: Make sure the positioning pin [A] on the mainframe is inserted properly in the
location hole [B] on the GBC StreamPunch.
[A]
[A]
[B]
[C]
[A]
Turn the bottom bolt
clockwise so that it
contacts the
p
late.
Loosen the nut and
make a space of
a
pp
rox 2mm.

Table of Contents

Other manuals for Ricoh pro c901

Related product manuals