10
5. Ensure that the handlebar is facing front, the
brake on the left side and the throttle on the
right, then tighten the handlebar tube collar
Multi-Point
clamp using the enclosed 5mm wrench.
6. Firmly connect wire harness to junction box
then slightly loosen junction box mounting
brackets and twist the junction box to the right
until it faces the rider. Re-tighten clamps.
7. Front half of scooter is now assembled