EasyManua.ls Logo

RMB EV Multi-Point - Page 49

RMB EV Multi-Point
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46
Instructions for optional attachments
Multi-Point
NOTE 1: When not using the solar panel for
more than one week, please turn off the
switch of solar panel.
NOTE 2: When disassembling the solar panel,
please turn off the switch of solar panel.
Instructions on the use of the alarm
1. Take out the alarm.
2. Connect the battery and install on seat post..
3. The 1 button is the alarm button. When

Related product manuals