EasyManua.ls Logo

Robinsons Victorian Ratcliffe 8 User Manual

Robinsons Victorian Ratcliffe 8
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
NOMINAL SIZE
A (mm) B (mm)
8 x 6
2602
2012
8 x 8 2632
8 x 10 3252
8 x 12 3872
Question and Answer IconNeed help?

Do you have a question about the Robinsons Victorian Ratcliffe 8 and is the answer not in the manual?

Robinsons Victorian Ratcliffe 8 Specifications

General IconGeneral
BrandRobinsons
ModelVictorian Ratcliffe 8
CategoryGreenhouse Kit
LanguageEnglish

Summary

Introduction and Safety Information

General Safety Guidelines

Essential safety precautions for assembly, including protective gear and handling materials.

Site and Base Preparation

Advice on choosing a level site and preparing a suitable foundation.

Assembly Tips

Recommendations for assembly timing, workspace, and component checks.

Base Dimensions and Requirements

Base Size and Leveling

Importance of a flat, level, and substantial base for greenhouse stability.

External Dimensions

Table detailing nominal and actual external dimensions for various models and extensions.

Frame Assembly - Sides and Gables

Parts Identification and Preparation

Locating and preparing components, including inserting glazing rubber.

Assembling Side Panels

Diagrams and part lists for constructing the side panels for different greenhouse sizes.

Assembling Front and Rear Gables

Detailed steps for constructing the front and rear gable ends.

Joining Frame Sections

Illustrations showing how to connect frame members, diagonals, and supports.

Roof and Vent Assembly

Roof Structure Assembly

Attaching the ridge, roof bars, and cresting for structural integrity.

Vent and Slam Bar Installation

Steps for assembling and fitting ventilation components and the slam bar.

Glazing and Door Installation

Glazing Procedure

Techniques for fitting glass panels using cappings and screws for a secure finish.

Door Assembly and Mounting

Steps for assembling the door and attaching it to the greenhouse frame.

Vent Attachment and Operation

Details on attaching vent mechanisms and ensuring smooth operation.

Final Assembly and Optional Additions

Finishing Touches and Anchoring

Completing the structure with sealing, downpipes, and securely anchoring the greenhouse.

Optional Shelving and Staging

Instructions for installing optional shelving and staging systems.

Related product manuals