Part C - Operation cobas p 512
3-14 Operator's Manual - Version 1.6 - 10/2015
3.3.4 Switching the system on
NOTICE
If a Silver Server from Roche PVT is used for communication with the LIS, switch this on first.
If a centrifuge module is connected to the cobas p 512 system, also switch this on.
Switch the system on. The main switch must be in the ON position. The system may take a
few minutes to start.
3-6: Main switch
3-7: Control light for the power supply
Control light for main switch
The system now powers up, the control light turns green, the system software launches and
the login screen is displayed on the touch screen monitor.