Part C - Operation cobas p 512
3-32 Operator's Manual - Version 1.6 - 10/2015
3.5. Terminating routine operation after daily routine
Ensure that all samples have been processed and that no
samples are located in the system.
Press the [Standby] button in the submenu 'Routine ▶
(OPTIONAL) Performing backup procedure
Execute a data backup procedure in the submenu
'Maintenance ▶ Daily Backup'.
Performing reorganization
The Clear data procedure can be performed optionally after
terminating sample processing operations. If performed now,
the function does not have to be carried out at the beginning
Logging out/ shutting down the system
Press the [Logout] button.
Confirm that you wish to log out in the window displayed
next.
To shut the system down, press the [Shutdown] button in the
Switching off the system
Switch the system off.
Inspecting the sorting area
Check the sorting area and rack conveyor for objects such as
caps, spilt fluids or samples.
Remove any such objects, residue or contaminants.
Care and maintenance procedures
Carry out care and maintenance procedures as necessary.